The design and build of a sanitising tunnel to facilitate the transport of factory equipment from a low care environment to a high care environment.
Styne Engineering’s experience of constructing equipment for use in factories where hygiene is of paramount importance came to the fore when building a conveyor system for ready-to-eat salads.
Styne Engineering has designed and installed service bridges at a number of sites across the UK, structurally calculated and fabricated to BS EN1090.